Home haunting project is recorded in detail with images and video as we transform a 2-car garage into the ultimate Halloween haunt experience. Inspired by the Disney Haunted House, the 'Halls of Doom' uses creatively creepy special effects, actors and other devices to produce a remarkably spooktacular result.
Showing posts with label haunted doors. Show all posts
Showing posts with label haunted doors. Show all posts
Saturday, October 15, 2011
Day 16- Fake walls
What seems like 100 years ago we laid out these plans which called for, of course, the elevator as the key event this year. If you look at those plans on this archived page (scroll down a bit) pay attention to the red bars in the diagram, or you can also find the plans in one of the posts to the right (under 'popular posts'). These are moving walls. In order to create a 'realistic' elevator sequence, you have to keep in mind that the guests are entering and leaving through the same doors! You have to figure out some way to alter the scenery when they get out onto the crypt level floor! This is why we created 2 fake walls as it were which are pictured here. When the guests come around the corner from the entrance hall to the elevator foyer (see plans above as needed) the first wall (shown here as a random stone wall) is retracted out of view into the peppers ghost hall area where the ghost actor is waiting to do the ghost routine. The second wall is visible in the foyer as just part of the normal foyer type scenery. This wall is positioned in front of the crypt door concealing it until the guests re-emerge onto the crypt level! I will paint it black and dress it up with many pictures to come! Now when the guests enter the elevator, my elevator operator actor who lets the guests in will slide the wall back exposing the crypt door and the ghost actor will slide the stone wall forward which then conceals the entrance hall! The fake walls are foam reinforced with 1x2 strips. These are extremely light weight and easily maneuvered using the same rolling suspension mechanism used on all the doors this year. Again, this rolling door concept was a major breakthrough and I was able to put up 6 of these with no problem this year!
I realize this is extreme, Ghouls, but hopefully you can see what we are trying to do. Ask any questions you wish!
Sunday, October 9, 2011
Day 22- Elevator facade
Things are moving along. We installed light and sound for the map room as well as the 2-way mirror. We'll have pics of that at some point but I wanted to post these elevator facade pics which are really great I think. We painted the front black for the doors and added some foam brick again on either side with a few skull props as well. The center prop was sawed in half and placed on each door as knobs! We are also going to put foam at the top of the elevator face with some uplighting. It's very hard to demonstrate the full effect with the actual light that will be seen but will try. Tomorrow is vortex day Ghouls, so stay tuned! We plan to get the canopy and hoops up and running. If we have time for the bridge we will do that to.
Thursday, August 18, 2011
Day 74- Haunted doors 101
Just a little more on this whole doors thing, only because it is THE critical feature in the basic design of the haunt. Doors will regulate your traffic. If you have no doors, no one will be stopping to look at anything. They just blow right past your elaborate props and sets that you spent a thousand hours creating! REGULATE your traffic, Ghouls, and direct your guests to stop and enjoy your handiwork! So as I mentioned several times already, I got this idea of suspended rolling doors from James Beach's 'Garage of Terror' website. This is the first year trying it and I must say it blows away the doors-on-wheels-in-a-track design. It is much smoother and virtually impossible to malfunction. No derailing which is what happened last year! These can be easily pulley operated at a distance! So the 'map room' entry door and the elevator doors I plan to operate from the control area. You can see in this video the door opening and closing. This is from inside the map room. The basic diagram of the set-up is shown. The hardboard is pretty light weight and flexible. I found by adding a 2x4 at the bottom and a 2x2 at the top, the board was adequately weighted down so it does not sway when it rolls and the added 2x2 at the top flattens the board so it isn't bowing.
Subscribe to:
Posts (Atom)






