Home haunting project is recorded in detail with images and video as we transform a 2-car garage into the ultimate Halloween haunt experience. Inspired by the Disney Haunted House, the 'Halls of Doom' uses creatively creepy special effects, actors and other devices to produce a remarkably spooktacular result.
Wednesday, October 31, 2012
2012- Day Zero- Halloween is a definite GO!
Well congratulations Ghouls! We survived Frankenstorm with not too much more than an inconvenience. I can't believe it's actually going to happen. After 2 years of preparing this build, no question this is the most spooktacular ever! I promise to have pictures and video over the next couple of days. It's just too crazy right now getting things done at the last minute, but I have tested extensively and had plenty of time for that. It's going to go very smoothly. Believe it or not I am actually going to need a ghoul helper in the control room! Never had that happen before. We also have an actual entrance door to the haunt with light and sound while the guests wait to go in! Today's schedule calls for taking some tarps off of the vortex, connecting the end of the haunt to the vortex, putting up some more webs, obviously cleaning up, putting the night crawlers on the corpse (don't forget we have some high schoolers who think they're real tough and nothing can scare them!), more testing and a couple of run throughs before the guests arrive. Much more to come. Stay tuned and Happy Haunting to Ghouls everywhere!
Monday, October 29, 2012
2012- Day 2 -Riding out the storm
We put a bunch of tarps around the vortex canopy. Gusts are pretty high right now but everything remains intact. Just after landfall now and the storm is moving faster than predicted which will be great if we can get through tonight and tomorrow without power loss. That is the key. I had our elevator operator over yesterday and we went through the sequence a couple of times. I swear I will be flipping switches and pulling pulleys like crazy for 2 1/2 hours straight!
One adjustment we will have to make is the peppers ghost effect will not be moving as we had planned. There is no way we can have someone push the cart at the right time, reposition and still allow for the stone panel to move in and out of the same space. Way too much happening. Plus when we tested the effect the light falls away from the ghost as he moves inward. There is not enough space to get the effect to work right. No matter. The static apparition still looks great and there is plenty of room for that.
One adjustment we will have to make is the peppers ghost effect will not be moving as we had planned. There is no way we can have someone push the cart at the right time, reposition and still allow for the stone panel to move in and out of the same space. Way too much happening. Plus when we tested the effect the light falls away from the ghost as he moves inward. There is not enough space to get the effect to work right. No matter. The static apparition still looks great and there is plenty of room for that.
Sunday, October 28, 2012
2012- Day 3- The Show Will Go On!
I think it looks OK for us. The brunt of the storm is looking like it will hit fairly well south. Basically just rain forecast for Wednesday. I had a couple of the actors over last night to review their scripts. One is stationed behind the drop panel, one is the 'Count' who will greet the guests in front of the elevator and will manage the sliding wall in front of the crypt door, and the third is the video operator who will work the snake projection image. Today I am having the elevator operator over. He has one of the more difficult jobs, namely pulling the elevator panel up and holding it there for several seconds until the guests leave the elevator. I did have to hire someone to do that! Once your haunt reaches the level where you need to start paying people to do jobs, maybe it's time to scale back? A bunch of weatherproofing steps also need to be taken today for the vortex ahead of whatever we get from the storm. Lots of testing over the next couple of days. I hope to have a bunch of pics and maybe some video.
Friday, October 26, 2012
2012- Day 5- 'Frankenstorm' or not
We are going to continue to move forward and prepare to run this build whether it happens on the 31st or not. Last year it was rescheduled for a week later but we were out of town. So I suppose if cooler heads prevail we can rationalize that it will happen but we're not sure when. I don't think there will be snow this time based on the latest forecasts. The question is the wind, how much, will power be out and for how long. You can't make this stuff up Ghouls, but we can't control it so we're moving on with the finish. Not much left to do. There is a foam entry door we need to set up, lot's of weather proofing between the garage and the vortex, one more sound byte for the ghost area, some last minute tune-ups for the vortex, mostly light-proofing and dot painting on the fabric. Finally we need to test everything over the next few days and go over the key actors and workers roles this weekend.
Thursday, October 25, 2012
2012- Day 6- Storm threatens the show for second straight year!!
Major storm approaches from lower right heading north |
Monday, October 22, 2012
2012- Day 9
Vortex with fabric installed |
Exit hall framed out |
Steps going into the vortex- finally! |
Sunday, October 21, 2012
2012-Day 10- Scenes from the upgraded Mansion
Entrance hall. Notice the 'real' webs! Skeleton and stacked books prop with chandelier a little further back. |
Chandelier view from the foyer |
Saturday, October 20, 2012
2012- Day 11- Air cannon reloaded
Wednesday, October 17, 2012
2012-Day 14- Vortex reloaded!
Monday, October 15, 2012
2012-Day 16- Rolling update
Vortex bridge reassembled! |
Chandelier nearly complete. One arm needs to be reattached. |
Friday, October 12, 2012
2012- Day 19 Hoops done!
Attaching arms to the base. You can drill an extra hole in the base to run the wires through. |
All 3 hoops reassembled! |
Wednesday, October 10, 2012
2012- Day 21- Chandelier update
Corpse arms complete with collars. We will have to add the chain links to the collars in the next few days for the final installation! |
Monday, October 8, 2012
2012- Day 23- The Vortex returns!
Vortex under construction. This will be its third year in operation! |
Roof of the canopy assembled. Notice the black duct tape reinforcing the connections. This is a must if you are going to use a structure like this! |
Saturday, October 6, 2012
2012- Day 25- Corpse arms road show
Completed corpse hands and forearms. Don't worry about the apparent hand to forearm width difference. The collars will hide those transitions! |
Friday, October 5, 2012
2012-Day 26 Latexed corpse hands
Corpse hands after latex application |
Tuesday, October 2, 2012
2012-Day 29 Corpse chandelier update
One of the 6 corpse hands which will be connected to the chandelier base |
Subscribe to:
Posts (Atom)